In 3 years, Linate will change: new spaces and green areas, there will even be a 4-star hotel a stone's throw from the terminal
'Behind' the terminal of Milan Linate Airport is an area that is unknown to most, because access is not open [...]
At the 'backs' of the terminal at Milan Linate airport. there is an area that is unknown to most because access is not open to the public. It consists of. A mix of space and buildings used for (airport) services and SEA offices, the company that manages Linate and Malpensa airports.
In this article:
Well, Between now and 2027, everything will change 'behind' Linate. In fact, SEA has presented a project that will see the implementation of the 'Linate Airport District.
The 38-thousand-square-meter area runs from the terminal to the Hydroscalo, where the following will be built New public spaces including green space, three office buildings (which will also house SEA's new headquarters). And a 4-star hotel with 220 rooms Within walking distance of the air terminal.
What is now an area off-limits to the public will thus become a public area that will more harmonize the presence of City Airport with the larger context of the seaport and its vast green areas, borrowing outside the terminal How much good and beautiful has been done internally with the 2021 redesign.
"With this project we complete the restyling of Linate. The opening of this area to the public will allow a direct connection between the seaport and the city, which, thanks to the metro, will also be conveniently accessible without a car," commented SEA President Armando Brunini.
The redevelopment plan, which Should be completed within 36 months (with the works starting as early as the end of 2024), it was entrusted to Costim, a giant in the real estate and urban regeneration industry, which there invested 130 million euros and that Will manage the spaces until the end of the concession in 2043.